Connection Pre-budget
before the distributor’s formal connection budget
See what your distributor publishes
Enter location and capacity. You get your distributor’s dossier — hosting capacity map when it exists, access portal, required forms and rules beyond PRODIST — plus the ANEEL regulatory checklist and the prepared budget request. Every item with source and access date; where nothing is published, the gap is declared by name. We never invent network hosting capacity.
What you get
Your case
MMGD classification, REN 1.000 deadlines, process roadmap, flow reversal, exemptions, protections and rights — each item with a Known/Partial/Gap badge and an official source.
What your distributor publishes
The heart of the dossier: the MMGD hosting capacity map when it exists — direct link and a 3-line “how to read” — plus the request portal, required forms and rules beyond PRODIST. Without a public source, the gap is declared by name.
Ready next step
The connection budget request, prepared: the case document checklist, the direct link into the distributor’s flow and the deadline it must meet (art. 64).
Seven distributors verified
What each one publishes today — in the dossier, every cell becomes a live link or a named gap.
| Distributor | Capacity map | Access portal | Forms |
|---|---|---|---|
| CEMIG-D | publishes | publishes | publishes |
| CPFL Paulista | does not publish | publishes | publishes |
| Enel SP | does not publish | publishes | publishes |
| Copel-DIS | does not publish | publishes | publishes |
| Neoenergia Coelba | publishes | publishes | publishes |
| Equatorial Pará | does not publish | publishes | publishes |
| Energisa Mato Grosso | does not publish | publishes | publishes |
| Light SESA | does not publish | publishes | publishes |
| Celesc-DIS | publishes | publishes | publishes |
sources verified on 2026-07-20
Another distributor? The result still ships the full ANEEL checklist, with the dossier gap declared by name — we never infer what we have not verified.